Wednesday 15 July 2015

2BHK & 3BHK Apartments for sale off Outer Ring Road, Bangalore at Mantri Lithos



Description:

Mantri Lithos is a spectacle set in stone. An abode so unique in design and formation ths it's a milestone among all other residentialspaces in the city. Crafted with a patische of eccentric shapes, rebellious structures and maverick contours, here's a residential address set out of eternity. Founded with structural contemplations that defy conventional living spaces, our creation is an antithesis to every known architecture. MantriLithos isn't just for everyone. It's for those who indulge in a life of adventure.

Specifications:

STRUCTURE
Earthquake resistance – Seismic zone II compliant RCC framed structure.
Solid Concrete Block Masonry.
PLASTERING
All internal walls will be smoothly plastered to give an even finish.
Ceiling cornices in rooms as Per Design/ Fire Fighting needs.
PAINTING
Acrylic emulsions with roller finish on wall and Oil bound distemper for Ceilings
Exterior - External emulsion paint.
MS Grills, Railing-Enamel Paint.
FLOORING
Foyer, Living, Dining, Family Room, Kitchen and bedrooms- Vitrified tile flooring.
Master Bed Room –Laminated Wooden flooring.
Utility, Balcony & Private Terrace- Anti skid Ceramic tile flooring.
Ground Floor Entrance Lobby Flooring- Granite & typical floors in Vitrified Tiles.
TOILETS
Master Bedroom Toilet - Ceramic tile flooring and Glazed Ceramic tile cladding.
Other Bedroom Toilets - Ceramic tile flooring and Glazed Ceramic tile cladding.
White European Water Closet in all toilets of Hindware make or equivalent.
White wash basin in all toilets of Hindware make or equivalent.
Single lever hot and cold water mixer unit for shower of Jaquar make or equivalent in all the toilets.
Wash basin mixer in master Bed room toilet and Pillar cock in all other toilets..
Health Faucet in all toilets.
Concealed master control cock (Ball valve) in each toilet, from inside, for easier maintenance.
Provision for geyser in the toilets.
Good quality CP fittings of Jaquar or equivalent.
False ceiling with UPVC panels.
PLUMBING
All Plumbing lines are pressure tested.
All water Supply lines are of CPVC of reputed make
PVC sewer lines.
Doors and Windows
MAIN DOOR
7 feet high engineered wood door frame equivalent to wall thickness.
Both side veneer pre engineered door shutter finished with natural PU laquer finish.
Good quality Brass/Chrome finishes hardware.
OTHER ROOM DOORS
7 feet high engineered wood door frame.
Pre-engineered door shutter with Crystal white-duco paint on both sides.
Good quality Brass/Chrome finishes hardware.
TOILET DOORS
Pre-engineered door shutters with one side crystal white-duco paint and white laminate on the other side.
Good quality Brass/Chrome finishes hardware.
BALCONY DOORS
Living room and Bedrooms will be provided with UPVC sliding doors with clear glass & provision for mosquito mesh.
WINDOWS AND VENTILATORS
All windows will be provided with UPVC sliding windows with plain sheet of glass with the provision for mosquito mesh.
Large size toilet ventilators made of UPVC with translucent glass fitted with a provision for exhaust fan.
MS grill will be provided for windows of Ground Floor apartment's utility.
KITCHEN
Provision for electrical & plumbing points for modular kitchen.
Granite platform with sink and drain board will be provided on request and at an extra cost.
Provision for water purifier.
Provision for Washing machine / Ironing board.
Piped gas system is provided with leak detection system in gas bank.
ELECTRICAL
One TV point in the living room and in all bedrooms.
An exclusive network of cable TV will be provided with centralized control room. (users to pay monthly charges)
Fire resistant electrical wires of reputed make.
Modular electrical switches of reputed make.
One miniature circuit Breaker (MCB) for each room provided at the main distribution box within each flat.
For safety, one Earth Leakage circuit Breaker (ELCB) will be provided for each flat.
Telephone points- To be provided in all bedrooms and the living room.
A group Centrex facility will be provided with cabling done up to each apartment. This will be operated by a Telecom Service provider for a nominal one –time charge and monthly rental.
Intercom facility (within Centrex) from each apartment to security room, clubhouse and other apartments.
Users to pay DG power usage charges at actuals as per metered consumption.
100% DG back up for Apartment load, common areas, Lifts and pumps.
Split A/C power point in Master Bed bedroom. (Box with conduit provision will be made in other bedrooms)
2 BHK – 3 kW, 3 BHK – 5 kW and 4.5BHK & pent house – 8 kW, with 100% DG back up.
A portion of the common lights shall be powered by solar energy.

For More:



1 comment: